SAMPLE PROJECT12 Kowhai StreetResidential alteration · Auckland CouncilReport snapshot · 12 August 2026
78%submission readiness
EXECUTIVE SUMMARY

Three matters should be cleared before lodgement.

The supplied pack is substantially assembled, but one high-priority revision conflict and two supporting-information questions could create avoidable clarification. Readiness is a workflow indicator, not a prediction of approval.

FINDINGS REGISTER

Evidence first. Action next.

Every item states what the software found, where the inconsistency appears and what the project team should confirm.

01
High

Engineering reference mismatch

Evidence in the supplied pack
PS1 refers to structural drawing S04 Rev B; the drawing register and uploaded structural set contain S04 Rev C.
Suggested project action
Ask the engineer to confirm the relied-on revision and issue a coordinated PS1 or drawing register before lodgement.
02
Review

Glazing specification is inconsistent

Evidence in the supplied pack
The H1 schedule identifies low-E IGU glazing while specification section 4521 lists clear double glazing to the same window type.
Suggested project action
Align the window schedule and specification, then confirm the H1 calculation still represents the proposed construction.
03
Review

Drainage evidence needs a clear hand-off

Evidence in the supplied pack
The architectural plan shows the proposed connection, but the pack does not contain the referenced drainage calculation or public-connection approval.
Suggested project action
Confirm whether the calculation and separate network approval apply, then add them or explain why they are not required.
DOCUMENT SET REVIEWED
  • Form 2 application details
  • Architectural drawing set
  • Project specification
  • Structural drawings and PS1
  • H1 calculation and schedule
  • Drainage plan and supporting records
BUILD AND CCC HAND-OFF
  • Approved consent set on site
  • Inspection record and failed-item actions
  • Concealed-work photographs
  • Records of Work
  • PS3 / PS4 and trade certificates
  • As-builts, variations and final close-out
EXPLORE THE WORKFLOW

See where this report comes from.

The interactive sample lets you move through submission, RFI, construction evidence and CCC views without creating an account or saving information.

Open the interactive sample